• <thead id="nf6nq"><rp id="nf6nq"><tr id="nf6nq"></tr></rp></thead>

    <sub id="nf6nq"><s id="nf6nq"></s></sub>

    
    
    <sub id="nf6nq"></sub>
    日韩午夜,国语高潮无遮挡无码免费看,亚洲激情AV,被灌满精子的波多野结衣,国产视频拍拍拍,人妻中出无码一区二区三区 ,久久久久久av,亚洲精品97久久一 上海金泰工程機械有限公司
    45 Luopu Road, Anting, Shanghai 400-820-8326

    NEWS

    BZ70 Hydraulic walking pile frame

    2010-03-20

    BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


     

    1.Stable machine system
    Mast, main platform and walking framework are specially designed for heavy pile foundation.
    39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
    It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
    The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
    The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
    Lifting-up cylinder stroke is 900mm, having the good trafficability.
    The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
    All cylinders adopt hydraulic proportional control system to make them balanced.
    2.Comfortable cabin
    All-transparent cab, bright, quiet and operator can avoid tiredness.
    Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
    3.Easy operating system
    The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
    4.Advanced imported components
    The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

    5.convenient installation and transportation
    The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
    The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
    39m mast can be self-driven without cranes.

    6.sensitive safety operation management device
    The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
    Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
    and slurry for each passage. All these information can be printed according to pile numbers.

    主站蜘蛛池模板: 成人福利一区二区视频在线| 国产精品区免费视频| 亚洲精品午夜天堂网页| 亚洲欧美熟妇综合久久久久| 香蕉视频一级在线观看| 天天爽天天爽天天片a| 黄色av网站在线观看| 97色伦图区97色伦综合图区| 国产熟妇婬乱A片免费看牛牛| 国产?熟女| 欧美精产国品一二三区| 欧美色图综合| 夜福利导航| 国产情侣激情在线对白| 亚洲成人aⅴ| 色综合激情丁香七月色综合| 国产一区二区三区免费播放| 欧洲免费一区二区三区视频| 少妇人妻偷人精品视蜜桃| 国产V亚洲V天堂A无码| 国产精品日韩精品日韩| 精品免费囯产一区二区三区| 天天操天天操天天| 26uuu亚洲| 一本色道久久| 中文字幕在线观看日本| 少妇被无套内谢免费看| 亚洲AV国产福利精品在现观看| 伊人成人在线高清视频| 亚洲一区二区啊射精日韩| 三级网站视频在在线播放| 日夜啪啪一区二区三区| 亚洲超碰无码色中文字幕97| 精品一区二区av天堂| 久久久综合亚洲色一区二区三区| 成人精品蜜臀在线观看| 国产在线 | 日韩| 一卡二卡中文字幕| 精品无人区一区二区三区在线| 国产成人精品二三区波多野| 人妻熟妇久久久久久精|