• <thead id="nf6nq"><rp id="nf6nq"><tr id="nf6nq"></tr></rp></thead>

    <sub id="nf6nq"><s id="nf6nq"></s></sub>

    
    
    <sub id="nf6nq"></sub>
    日韩午夜,国语高潮无遮挡无码免费看,亚洲激情AV,被灌满精子的波多野结衣,国产视频拍拍拍,人妻中出无码一区二区三区 ,久久久久久av,亚洲精品97久久一 上海金泰工程機械有限公司
    45 Luopu Road, Anting, Shanghai 400-820-8326

    NEWS

    BZ70 Hydraulic walking pile frame

    2010-03-20

    BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


     

    1.Stable machine system
    Mast, main platform and walking framework are specially designed for heavy pile foundation.
    39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
    It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
    The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
    The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
    Lifting-up cylinder stroke is 900mm, having the good trafficability.
    The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
    All cylinders adopt hydraulic proportional control system to make them balanced.
    2.Comfortable cabin
    All-transparent cab, bright, quiet and operator can avoid tiredness.
    Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
    3.Easy operating system
    The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
    4.Advanced imported components
    The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

    5.convenient installation and transportation
    The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
    The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
    39m mast can be self-driven without cranes.

    6.sensitive safety operation management device
    The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
    Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
    and slurry for each passage. All these information can be printed according to pile numbers.

    主站蜘蛛池模板: 亚洲欧美日韩综合久久| 乌克兰美女浓毛bbw| 免费无码无遮挡裸体视频在线观看 | 欧美国产日韩在线三区| 精品国产丝袜黑色高跟鞋| 亚洲午夜性猛春交XXXX| 国产欧美一区二区精品久久久| 色婷婷五月综合久久| 老司机午夜精品99久久免费| 国产农村激情免费专区| 丁香五月婷激情综合第九色| 亚洲欧美日韩中文字幕一区二区 | 亚州看片| 伊人久久人妻| 三级网址大全| 中日韩黄色基地一二三区| 凹凸在线无码免费视频| 亚洲第一视频在线观看| 中文字幕在线v| 欧美精品18videosex性欧美| 国产一区| 国产精品 精品国内自产拍| 免费观看全黄做爰大片| 99久久激情国产精品| 性人久久久久| 亚洲av乱码国产精品色 | 日本道播放一区二区三区| 人妻无码久久中文字幕专区| 国产美女裸体无遮挡免费视频高潮| 色婷婷综合久久久中文字幕| 99riav精品免费视频观看| 国产高清精品在线91| 中文字幕AV伊人AV无码AV| 99精品久久精品| 亚洲视频播放| 亚洲成人国产精品| 手机看片久久国产永久免费| 深夜精品免费在线观看| 欧美A片在线观看| Av无码一区二区三区| 热门午夜福利|