• <thead id="nf6nq"><rp id="nf6nq"><tr id="nf6nq"></tr></rp></thead>

    <sub id="nf6nq"><s id="nf6nq"></s></sub>

    
    
    <sub id="nf6nq"></sub>
    日韩午夜,国语高潮无遮挡无码免费看,亚洲激情AV,被灌满精子的波多野结衣,国产视频拍拍拍,人妻中出无码一区二区三区 ,久久久久久av,亚洲精品97久久一 上海金泰工程機械有限公司
    上海安亭洛浦路45號 400-820-8326

    NEWS

    BZ70 Hydraulic walking pile frame

    2010-03-20

    BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


    ?

    1.Stable machine system
    Mast, main platform and walking framework are specially designed for heavy pile foundation.
    39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
    It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
    The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
    The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
    Lifting-up cylinder stroke is 900mm, having the good trafficability.
    The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
    All cylinders adopt hydraulic proportional control system to make them balanced.
    2.Comfortable cabin
    All-transparent cab, bright, quiet and operator can avoid tiredness.
    Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
    3.Easy operating system
    The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
    4.Advanced imported components
    The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

    5.convenient installation and transportation
    The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
    The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
    39m mast can be self-driven without cranes.

    6.sensitive safety operation management device
    The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
    Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry??
    and slurry for each passage. All these information can be printed according to pile numbers.

    主站蜘蛛池模板: 岛国大片视频在线播放| FREEXX性黑人大战欧美视频| 欧美野外伦姧在线观看| 无码国产69精品久久久久app| 久久精品亚洲中文无东京热| 亚洲中文字幕在线精品一区| 国产精品白丝久久av网站| 欧美中文字幕精品人妻| 国产69精品久久久久妇女| 中文精品久久久久中文| 亚洲一区二区三区在线观看精品中文| 亚洲人成日韩中文字幕不卡| 免费看国产成年无码AV片| 广东少妇大战黑人34厘米视频| 在线a级毛片无码免费真人| 中文字幕人妻熟女人妻a?6| 一本色道久久综合无码人妻| 九九热精品在线观看视频| 免费网站观看www在线观| 免费精品美女久久久久久久久久| 亚洲国产精品午夜福利| 成年人尤物视频在线观看| 中文av字幕在线| 18分钟处破好疼哭视频在线观看 | 成人午夜电影福利免费| 日产欧美国产日韩精品| 精品无码人妻av受辱日韩| 亚洲一区av| 国产成人精品久久一区二区| 成人午夜大片| 久久精品亚洲一区二区三区浴池| 亚洲国产精品午夜福利| 97国产成人无码精品久久久| 亚洲高清日韩heyzo| 日韩欧美在线综合网另类| 国产熟女精品视频| 粗大的内捧猛烈进出小视频| 元谋县| 国产成人精品午夜在线播放| 在线a综合V久一区精中| 亚洲av无在线播放中文|