• <thead id="nf6nq"><rp id="nf6nq"><tr id="nf6nq"></tr></rp></thead>

    <sub id="nf6nq"><s id="nf6nq"></s></sub>

    
    
    <sub id="nf6nq"></sub>
    日韩午夜,国语高潮无遮挡无码免费看,亚洲激情AV,被灌满精子的波多野结衣,国产视频拍拍拍,人妻中出无码一区二区三区 ,久久久久久av,亚洲精品97久久一 上海金泰工程機械有限公司
    上海安亭洛浦路45號 400-820-8326

    NEWS

    BZ70 Hydraulic walking pile frame

    2010-03-20

    BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


    ?

    1.Stable machine system
    Mast, main platform and walking framework are specially designed for heavy pile foundation.
    39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
    It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
    The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
    The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
    Lifting-up cylinder stroke is 900mm, having the good trafficability.
    The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
    All cylinders adopt hydraulic proportional control system to make them balanced.
    2.Comfortable cabin
    All-transparent cab, bright, quiet and operator can avoid tiredness.
    Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
    3.Easy operating system
    The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
    4.Advanced imported components
    The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

    5.convenient installation and transportation
    The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
    The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
    39m mast can be self-driven without cranes.

    6.sensitive safety operation management device
    The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
    Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry??
    and slurry for each passage. All these information can be printed according to pile numbers.

    主站蜘蛛池模板: 亚洲爆乳少妇无码激情| 久久狼人大香伊蕉国产| 亚洲午夜久久久影院伊人| 69视频网站| 凌海市| 国产精品亚洲一区二区杨幂| 人妻无码久久| 色综合色综合色综合久久| 深夜福利电影在线观看| 亚洲欧美自偷自拍另类| 青楼妓女禁脔道具调教sm| 国产乡下精品三级在线观看| 天堂一区在线观看| 国产免费午夜福利片在线| 五月天激情小说| 偷拍精品一区二区三区| 色噜噜AV亚洲色一区二区| 国产亚洲欧美在线专区| 欧美成本人视频免费播放| 中文字幕国产精品日韩| 中文字幕精品人妻丝袜| gogogo高清在线观看视频中文| 元朗区| 国产乱人伦真实精品视频| 依依成人精品视频在线观看| 亚洲av精彩一区二区| 九九久久国产精品免费热6| 亚洲色久悠悠av在线观看| 欧美福利一区| 亚洲国产激情一区二区三区| 中文字幕久久久久久久系列| 司法| 亚洲无 码A片在线观看| 99视频有精品视频高清视频 | 国产AV一区二区三区| 国产91丝袜在线观看| 在线永久免费观看黄网站| 337p日本大胆欧美人术艺术69 | 中文字幕亚洲乱亚洲乱妇| 久热re国产手机在线观看| 国产AV无码专区亚洲AWWW|