• <thead id="nf6nq"><rp id="nf6nq"><tr id="nf6nq"></tr></rp></thead>

    <sub id="nf6nq"><s id="nf6nq"></s></sub>

    
    
    <sub id="nf6nq"></sub>
    日韩午夜,国语高潮无遮挡无码免费看,亚洲激情AV,被灌满精子的波多野结衣,国产视频拍拍拍,人妻中出无码一区二区三区 ,久久久久久av,亚洲精品97久久一 上海金泰工程機械有限公司
    上海安亭洛浦路45號 400-820-8326

    NEWS

    BZ70 Hydraulic walking pile frame

    2010-03-20

    BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


    ?

    1.Stable machine system
    Mast, main platform and walking framework are specially designed for heavy pile foundation.
    39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
    It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
    The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
    The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
    Lifting-up cylinder stroke is 900mm, having the good trafficability.
    The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
    All cylinders adopt hydraulic proportional control system to make them balanced.
    2.Comfortable cabin
    All-transparent cab, bright, quiet and operator can avoid tiredness.
    Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
    3.Easy operating system
    The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
    4.Advanced imported components
    The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

    5.convenient installation and transportation
    The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
    The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
    39m mast can be self-driven without cranes.

    6.sensitive safety operation management device
    The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
    Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry??
    and slurry for each passage. All these information can be printed according to pile numbers.

    主站蜘蛛池模板: 亚洲中文字幕无码专区| 在线观看亚洲精品国产福利片| 亚洲色婷婷婷婷五月基地| 亚洲第一色| 成人精品无码成人亚洲 | 国产盗摄老熟女视频一区二区三区| 亚洲欧美日韩中文高清WWW777 | 久久精品亚洲| 虹口区| 无码精品久久久久久人妻中字| 女子spa高潮呻吟抽搐| 色综合天天综合网国产成人网| 亚洲天堂2025| 麻豆精品久久久久久久99蜜桃 | 亚洲成av| 婷婷丁香五月天永久在线| 亚洲av无码片在线播放| 在线 欧美 中文 亚洲 精品| 久久熟| 亚洲蜜桃av一区二区三区| 久久99国内精品自在现线| 精品国产一区二区三区av性色| 四虎库影成人在线播放| 桃子视频亚洲一二三区| 免费AV手机在线观看片| 亚洲激情一区二区| 一本色道无码DvD免费视频| 日韩一级片| 国产黄色三级三级看三级| 午夜福利国产一区二区三区| 对白刺激的老熟女露脸| jizz国产免费观看| 中文字幕av无码免费一区| 欧洲高清无码| 久久精品国产91久久性色tv| 国产在线午夜不卡精品影院 | 无码精品人妻一区二区三| 色yeye免费人成网站在线观看| 久久―日本道色综合久久| 麻豆精品在线| 国产成人综合手机在线播放|